Betekenis van:
whole works

whole works
Zelfstandig naamwoord
    • everything available; usually preceded by `the'

    Synoniemen

    Hyperoniemen

    Werkwoord

    whole works

    Voorbeeldzinnen

    1. As a whole his works are neither good nor bad.
    2. A ‘work’ means the outcome of building or civil engineering works taken as a whole which is sufficient of itself to fulfil an economic or technical function;
    3. Stocks in the whole works including locally integrated activities should be entered in these codes (including steel foundries) with the exception of stocks held in iron foundries.
    4. ‘Works contracts’ means contracts having as their object either the execution, or both the design and execution, of works related to one of the activities mentioned in Division 45 of the CPV, or a work, or the realisation, by whatever means, of a work corresponding to the requirements specified by the contracting authority/entity. A ‘work’ means the outcome of building or civil engineering works taken as a whole that is sufficient of itself to fulfil an economic or technical function;
    5. Nevertheless, when a set is composed of originating and non-originating products, the set as a whole shall be regarded as originating, provided that the value of the non-originating products does not exceed 15 % of the ex-works price of the set.
    6. Public contracts are contracts for pecuniary interest concluded in writing between one or more economic operators and one or more contracting authorities within the meaning of Articles 104 and 167, in order to obtain, against payment of a price paid in whole or in part from the budget, the supply of movable or immovable assets, the execution of works or the provision of services.
    7. Nevertheless, when a set is composed of originating and non-originating products, the set as a whole shall be regarded as originating, provided that the value of the non-originating products does not exceed 15 % of the ex-works price of the set.
    8. Without prejudice to Article 8, the members of the European Works Council shall inform the representatives of the employees of the establishments or of the undertakings of a Community-scale group of undertakings or, in the absence of representatives, the workforce as a whole, of the content and outcome of the information and consultation procedure carried out in accordance with this Directive.
    9. Public contracts shall be contracts for pecuniary interest concluded in writing by the Agency acting as a contracting authority, in order to obtain, against payment of a price paid in whole or in part from the general budget, the supply of movable or immovable assets, the execution of works or the provision of services.
    10. Public contracts are contracts for pecuniary interest concluded in writing between one or more economic operators and one or more contracting authorities within the meaning of Article 92 in order to obtain, against payment of a price paid in whole or in part from EDF resources, the supply of movable or immovable assets, the execution of works or the provision of services.
    11. works for deployment/infrastructure expenditure absolutely needed for the force as a whole to fulfil its mission (common used airport, railway, harbours, roads, including points of disembarkation and forward assembly areas; power and water supply, static force protection, storage facilities, parking lots; engineering support);
    12. Nevertheless, when a set is composed of originating and non-originating products, the set as a whole shall be regarded as originating, provided that the value of the non-originating products does not exceed 15 % of the ex-works price of the set.
    13. However, the contracting authorities/entities may waive such application in respect of lots the estimated value of which, net of VAT, is less than EUR 80000 for services or EUR 1000000 for works, provided that the aggregate value of those lots does not exceed 20 % of the aggregate value of the lots as a whole;
    14. Sets, as defined in General Rule 3 of the Harmonised System, shall be regarded as originating when all component products are originating. Nevertheless, when a set is composed of originating and non-originating products, the set as a whole shall be regarded as originating, provided that the value of the non-originating products does not exceed 15 % of the ex-works price of the set.